Website Development

How much does a website cost in Egypt, and how long does it take?

Short answer: a focused business website in Egypt typically takes 3–5 weeks to design and build, and its cost is set by four things: the number of unique page designs, the features it needs, whether it is bilingual (Arabic and English), and whether it runs on a CMS or is custom-built.

Published6 Oct 2026
Reading time7 min read

Prices quoted for “a website” in Egypt range from a few thousand pounds for a template to six figures for a custom platform, because the word covers very different products. The way to compare quotes fairly is to compare what is actually included.

What decides the cost

  • Unique page designs: a home page, a service page template and a contact page are three designs, even if the site has thirty pages.
  • Features: online booking, user accounts, payments, a members area, or integrations with a CRM or ERP each add design, development and testing time.
  • Arabic and English: a true bilingual site needs right-to-left layouts, Arabic typography and translated content, not just a language switcher.
  • CMS or custom: WordPress or a headless CMS is faster for content-led sites; a custom build (for example Next.js) suits sites that behave like applications.
  • Content and SEO: copywriting, photography, page metadata, structured data and a sitemap are often left out of cheap quotes.
  • Hosting, security and maintenance: an SSL certificate, backups, updates and monitoring are ongoing costs, not one-off.

Typical timeline

A focused site of up to around ten pages usually takes 3–5 weeks: one week for discovery and structure, one to two for design, and one to two for build, content and testing. Each major feature, such as bookings or user accounts, typically adds one to two weeks. The fastest projects are the ones where content and approvals are ready on time.

What a good quote should include

  1. A page list and the number of unique designs.
  2. The features in scope, and what is explicitly out of scope.
  3. Who writes the content and who provides images.
  4. Mobile responsiveness, accessibility and page-speed targets.
  5. SEO basics: titles, descriptions, structured data, sitemap and redirects from any old site.
  6. Security: HTTPS, security headers, protected admin login, backups and update policy.
  7. Ownership: you should own the domain, the hosting account and the code or CMS.
  8. Support after launch, and its monthly cost.

Do not skip security

Most small-business websites that get hacked are not targeted; they are found by bots scanning for outdated plugins and weak admin passwords. A secure build costs little more than an insecure one, and it is far cheaper than cleaning up after an infection or a blacklisted domain. You can check any existing site in about a minute with our free website security check.

Compare quotes by what is included, not by the headline price. The cheapest website is often the one you have to rebuild a year later.
FAQ

Frequently asked questions

How long does it take to build a business website in Egypt?

A focused business website of up to about ten pages typically takes 3–5 weeks from kick-off to launch. Features such as online booking, user accounts or payments usually add one to two weeks each.

Should my website be in Arabic and English?

If you sell to customers in Egypt or the Gulf and also to international clients, yes. A proper bilingual site has right-to-left Arabic layouts and its own Arabic content and search metadata, which also helps it appear in Arabic searches.

WordPress or a custom-built website?

WordPress is a good fit for content-led sites that your team will update often. A custom build, for example with Next.js, is better when the site behaves like an application, needs high performance, or must integrate tightly with other systems.

Who should own the domain and the code?

You should. Make sure the domain, hosting account and source code or CMS admin are registered to your company, with your developer given access, not the other way round.

Does CYBEROCO build websites?

Yes. CYBEROCO designs and builds secure websites, web applications, online stores and mobile apps for companies in Egypt and the Middle East, with security reviewed by its own penetration testers before launch.

Keep reading

More field notes

Software Development6 Oct 2026 · 7 min read

Custom software or off-the-shelf? How to decide, and what a custom build involves

Buy when your process is standard; build when it is your advantage. A first release usually takes 10–16 weeks.

Read article
Mobile App Development6 Oct 2026 · 7 min read

Native or cross-platform? A practical guide to building a mobile app

Most business apps are best built cross-platform. A first release usually takes 8–12 weeks, including the backend.

Read article
E-commerce6 Oct 2026 · 7 min read

How to launch a secure online store in Egypt: platforms, payments and shipping

Pick the platform by catalogue size and how custom your checkout is. A secure store usually takes 5–8 weeks.

Read article
Cyber Security6 Oct 2026 · 7 min read

How much does a penetration test cost, and what should it include?

Cost follows scope: the number of apps, roles, APIs and IPs. A single web app usually takes 5–10 testing days.

Read article
Pen Test Debrief12 Aug 2026 · 6 min read

Three ways we still get into “PCI compliant” web apps

A walkthrough of the logic flaws and misconfigurations that keep showing up in engagements, despite a clean compliance report.

Read article
Incident Response5 Aug 2026 · 5 min read

What the first 60 minutes of a ransomware incident actually look like

Containment decisions, stakeholder communication, and the mistakes that turn a bad day into a bad quarter.

Read article
Research29 Jul 2026 · 5 min read

API authorisation flaws: the gap between “authenticated” and “authorised”

Why so many APIs correctly check who you are, but not what you're allowed to do — and how we test for it.

Read article